When the builder starts to build a house, his estimate will have to be corrected and re-vised because__________.
参考答案
C
答案解析
本题属细节考查题。考查的是在盖房的施工中,最初的预算必须更正与修改的原因。短文第二段的倒数一、二句就有相对应的部分;随后,当他开始施工时,此预算必须更改与修正。他的预算的根据是当时价格。而建筑材料与其他东西的价格在制订预算和开始施工这一阶段很可能会有变化。A项说的是“预算经常被施工者算错”,在短文中没有依据;B项的“未来的房主认为预算太高他支付不起”在短文中也没有依据,D项的“在开始时预算往往是错的”与A项的错误如出一辙。
你可能感兴趣的试题
A.The plan depends on the estimate
B.The estimate depends on the plan
C.The plan has nothing to do with the estimate
D.The estimate and the plan depend on each other