单选题 公共英语四级
题号 #3861071

根据以下材料,回答题
Who's to blame? The trail of responsibility goes beyond poor maintenance of British railways,say industry critics.Stingy governments both Labor and tory have cut down on investments intrains and rails.In the mid-1990s a Conservative government pushed through the sale of the entiresubsidy-guzzling rail network.Operating franchises were parceled out among private companies anda separate firm, Railtrack, was awarded ownership of the tracks and stations.In the future, thetheory ran back then, the private sector could pay for any improvements with a little help from thestate and take the blame for any failings.
today surveys show that travelers believe privatization is one of the reasons for the railways'sfailures.They ask whether the pursuit of profits is compatible with guaranteeing safety.Worse,splitting the network between companies has made coordination nearly impossible."The railway wastorn apart at privatization and the structure that was put in place was.., designed, if we are honest,to maximize the proceeds to the Treasury," said Railtrack boss Gerald Corbett before resigning lastmonth in the wake of the Hatfield crash.
Generally, the contrasts with mainland Europe are stark.Over the past few decades the Germans,French and Italians have invested 50 percent more than the British in transportation infrastructure.Asa result, a web of high-speed trains now crisscross the Continent, funded by governments wilting tocommit state funds to major capital p.rojects.Spain is currently planning 1,000 miles of new high-speed track.In France superfast trains already shuttle between all major cities, often on dedicatedlines.And in Britain? When the Eurostar trains that link Paris, London and Brussels emerge fromthe Channel Tunnel onto British soil and join the crowded local network, they must slow down from186 mph to a maximum of 100 mph--and they usually have to go even slower.
For once, the government is tistening.After all, commuters are voters, too.In a pre-votespending spree, the government has committed itseff to huge investment in transportation, as wellas education and the public health service.Over the next 10 years, the railways should get an extra~60 billion, partly through higher subsidies to the private companies.As Blair ackoowledged lastmonth, "Britain has been underinvested in and investment is central to Britain's future." You don'thave to tell the 3 million passengers who use the railways every day.Last week trains to Darlingtonwere an hour late--and crawling at Locomotion No.1 speeds.
In the first paragraph, the author tries to

进入在线模考

参考答案

C

答案解析

C该题为细节题。在第一段中,作者回顾了英国铁路的现状产生的  根源,即铁路的私有化。根据第一段第一、二句“Who is to blame?
The trail of responsibility goes beyond poor maintenance of Britishrailways,say industry critics.”可知,英国铁路系统不健全,铁路速度慢的原因不只在于英国铁路的养护不善。下文对其原因作出了具体的解释,故选C。

你可能感兴趣的试题

A.its structural design.
B.the pursuit of profit.
C.its inefficient network.
D.the lack of safety guarantees.
A.for the benefit of commuters.
B.to the advantage of the government.
C.for the effect of better coordination.
D.as a replacement of the private system.
A.trains in Britain can ran at 100 mph at least.
B.Britain should build more express lines.
C.rails in Britain need further privafization.
D.British railway is left a long way behind.
找试题 · 找答案 · 找资料 在线模考