单选题
题号 #5998504

 The statement of the Ministry of Defence implies that the armed forces will

进入在线模考

参考答案

A

答案解析

【试题类型】具体信息题。。
【解题思路】根据题干关键信息The statement of the Ministry of Defence和the armed forces可定位至第四段第一句。该句提到the Ministry of Defence confirmed it had withdrawn its resources from Gatwick,though a spokesman said the armed forces “stand ever ready to assist should a request for support be received”.(国防部证实已从盖特威克机场撤回资源,尽管一位发言人表示,武装部队“如果收到支持请求,随时准备提供援助”),故选项[A] provide assistance as soon as they receive a support request(一旦他们收到支持请求,会立即提供帮助)为正确答案。其中,原文中的stand ever ready to assist对应选项It]中的provide assistance,原文中的should a request for support be received对应选项[A]中的as soon as they receive a support request。
【干扰排除】第四段第一句提到,国防部证实已从盖特威克机场撤回资源,一位发言人表示,武装部队“如果收到支持请求,随时准备提供援助”,由此可知,撤回资源和收到请求之间不存在联系,故选项[B]withdraw resources from the airports if they receive a command“如果收到命令,则撤出资源”错误,应排除;选项[C]wait for further instructions when receiving support missions“收到援助任务后,等待进一步指示”和选项[D]deploy anti.drone apparatus should a support request be received“如果收到援助请求,则部署反无人机系统”这两项原文并未提及,应排除。

你可能感兴趣的试题

A.further deploy anti-drone systems
A.further deploy anti-drone systems
B.eliminate the threat of drones
B.eliminate the threat of drones
C.cooperate with the armed forces
C.cooperate with the armed forces
D.purchase new anti-drone apparatus
D.purchase new anti-drone apparatus
A.Drones are owned by credible people.
A.Drones are owned by credible people.
B.The police's crafts do not include drones.
B.The police's crafts do not include drones.
C.Evidence for drone disruption is unclear.
C.Evidence for drone disruption is unclear.
D.The possible culprit is still at large.
D.The possible culprit is still at large.
3 根据下面资料,回答题
A cluster of state-owned power plants in north-western Greece have been spewing
smoke and toxic ash over nearby villages for decades. The plants are fueled by lignite, a dirty brown coal extracted from open-pit mines that scar the local countryside. Studies have
shown that mining communities suffer above-average rates of lung disease and cancer, yet jobs in other sectors are scarce in a region with chronically high unemployment.
Changes may be on the way. Kyriakos Mitsotakis, the new centre-right prime minister,
has promised to shut down all of Greece's 14 lignite-fired power stations by 2024. Fleets of wind turbines and solar panels will be rolled out across rehabilitated mining areas. Mr Mitsotakis is anxious to boost Greece's green credentials: at present its annual carbon- equivalent emissions are a third higher than those of Portugal, a similar-sized EU member state. Despite being blessed by abundant sunshine and strong winds that blow year-round
across the Aegean sea, Greece is still a clean-energy laggard. That is mostly due to PPC, the state electricity utility, which has stuck to lignite to save money, rather than switching
to natural gas and renewables. In 2017 some 70% of homes and businesses consumed
electricity that was produced at PPC's lignite-fired power stations. This year the figure may fall to 50%: small private suppliers that run natural-gas-fired plants have picked up customers fleeing PPC after Mr Mitsotakis's government raised its electricity prices. The prime minister has set himself a remarkably ambitious target: renewable sources are to cover 35% of Greece's energy needs by 2030. That would mean tripling current wind and solar output, at a cost of around C40bn. Consultants predict a bonanza for foreign investors: Chinese, American, Spanish and Italian companies already own Greek wind and solar installations and are acquiring licences to build more.
Oddly, they will face strong opposition from Greece's increasingly active environmental  movement. It takes up to seven years for a licence for a wind park to be granted; many  applications are rejected by specialist judges at the council of state, Greece's highest legal body.
Apostolos Pantelis, a hill-walker, is campaigning against plans to build wind parks on  mountain ridges in the remote Agrafa region, a refuge for rare griffon vultures, brown bears and wolves. Greece's environment is "too fragile" to sustain such big projects, he says. New roads would erode the mountainsides and noisy, 200m-high turbines would scare away its wildlife. He says that "people used to think wind energy would be beneficial for tourism. But it just ruins the view."
The Greece government is going to    in north-western Greece.
A.shut down lignite power plants
A.shut down lignite power plants
B.solve the problem of unemployment
B.solve the problem of unemployment
C.lower the rate of lung disease
C.lower the rate of lung disease
D.revitalize the mining communities
D.revitalize the mining communities
找试题 · 找答案 · 找资料 在线模考